Ecotec Plus Vaillant Aquaplus. Vaillant Ecomax Vaillant Ecomax E. Vaillant Ecomax Pro 18E. Vaillant Ecomax Pro 28E. Vaillant Ecomax VU E. Vaillant Ecomax VU Vaillant Ecotec Plus Vaillant Ecotec Plus Manuals. Vaillant Ecotec Plus Manual. Vaillant Ecotec Pro Vaillant Ecotec Pro 28 Manuals. Vaillant Ecotec VU Vaillant Ecotec VU R1. Vaillant Thermocompact E. Vaillant Thermocompact VC T. Vaillant Thermocompact VC E. Vaillant TurboMax Plus E.

The boilers are not suitable for external installation. If desired, an inhibitor may be used in the system. Guidance on the use of inhibitors is contained in these instructions. This appliance should only be installed in conjunction with a Vaillant flue system. Install the flue system as detailed in the separate flue installation instructions supplied with this boiler. It should also be in accordance with the relevant requirements of the Local Authority, Building Regulations, Building Standards Scotland Regulations and the relevant recommendations of the following British Standards:.

BS Services supplying water for domestic use within buildings and their curtilages. BS Specification for installation of gas fired boilers not exceeding 60 kW input. BS Specification for installation of low pressure gas pipework up to 28 mm R1 in domestic premises 2 nd family gas. Important: The appliance must be installed and serviced by a competent person as stated in the Gas Safety Installation and Use Regulations The location chosen for the boiler must permit the provision of a satisfactory flue termination.

The location must also provide adequate space for servicing and air circulation around the boiler. The boiler may be installed in any room, although particular attention is drawn to the requirements of BS IEE Regulations and, in Scotland, the electrical provisions of the Building Standards Scotland Regulations, in respect of the installation of a boiler in a room containing a bath or shower.

Note: Where a room sealed boiler is installed in a room containing a bath or shower, any electrical switch or boiler control utilising mains electricity should be so situated that it cannot be touched by a person using the bath or shower. Where the installation of the boiler will be in an unusual location, special procedures may be necessary and BS and BS give detailed guidance on this aspect.

The boiler must be mounted on a flat, vertical wall, which must be sufficiently robust to take the weight of the boiler. The boiler may be installed on a combustible wall, subject to the requirements of the Local Authorities and Building Regulations. A compartment used to enclose the boiler must be designed and constructed specifically for this purpose. An existing cupboard or compartment may be used provided that it is modified for the purpose.

A gas meter may only be connected to the service pipe by the supplier of gas or their contractor. An existing meter should be checked to ensure that it is capable of passing the rate of gas supply required. Pipework from the meter to the boiler must be of an adequate size. Do not use pipes of a smaller size than the boiler gas connection 15 mm.

The complete installation must be tested for soundness and purged as described in BS LAS Euro. GU LAZ. Note: The boilers are delivered ready for installation utilising a top outlet flue assembly. For installation with a rear outlet flue assembly refer to the boiler flue outlet adaptation instructions supplied with the rear flue accessory. The top outlet horizontal flue system Art. Flue extensions are available to extend this length up to 5. The rear outlet horizontal flue system Art.

A top outlet horizontal flue system of mm outside diameter is also available Art. The terminal must be positioned such that the products of combustion can disperse freely at all times. In certain weather conditions a plume of water vapour may be visible from the flue terminal.

If the terminal is fitted less than 2 m above a balcony, above ground or above a flat roof to which people have access then a suitable terminal guard;. Note: Vertical flues must not terminate within mm of an openable window, air vent or any other ventilation opening. Where a terminal is fitted less than 1 m below a plastic gutter or less than 0. It is not necessary to have an air vent in the room or internal space in which the boiler is installed. The boilers are very high efficiency appliances.

As a consequence the heat loss from the. For cupboard or compartment installations it is therefore not necessary to provide any high or low level permanent air vents for cooling purposes. The method of connection to the mains electricity supply must provide a means of completely isolating the boiler and its ancillary controls.

Isolation is preferably by the use of a fused three pin plug and unswitched shuttered socket outlet, both complying with the requirements of BS Alternatively, a 3 Amp. Detailed recommendations for the water circulation system are given in BS and BS Part 1 for small bore and micro bore central heating systems. Pipework not forming part of the useful heating surface should be insulated to help prevent heat loss and possible freezing, particularly where pipes are run through roof spaces and ventilated underfloor spaces.

Draining taps must be located in accessible positions which permit the draining of the whole system including the boiler and the hot water system. BSP nominal size and be in accordance with BS The boiler is suitable for use with minibore or microbore systems. Copper tubing to BS Part 1 should be used for water carrying pipework. All capillary joints in all DHW pipework must be made with lead free solder. Particularly where a new boiler is to be fitted to an existing system, it is good practice that the system is thoroughly cleansed.

This cleansing should take place prior to the fitting of the new boiler and be in accordance with BS For advice on the application of system cleansers contact either Sentinel, Betz Dearborn Ltd. The connection must be removed when filling is completed.

Where local Water Authority regulation does not allow temporary connection, a sealed system filler pump with break tank must be used. Booster Pumps. Condensate Pumps. Pump Accessories. Smart Controls. Central Heating Controls. Motorised Valves.